Safety & Quality

Safety and Quality on Every CoatEXX Site

We operate factories, cleanrooms and warehouses. Our team adheres to the safety regulations of the site and performs quality checks to help ensure that each flooring system will be able to comply with the requirements specified.

Site Safety

Safe people. Safe sites.

Care must be taken with handling and processing of resins, grinding equipment and work at height. Our staff is trained on safety measures to ensure the protection of our employees, clients, equipment and the work area.

  • Safety Briefings: Conducted prior to the start of work to discuss the potential hazards, site rules and emergency exits.
  • Personal Protective Equipment (PPE): Workers are wearing appropriate helmets, high-visibility vests, safety shoes, gloves and eye protection. In food processing and the pharmaceutical industry, other hygiene needs are adhered to.
  • Working at Height: Suitable mobile scaffold towers with guardrails and secured wheels are used for wall and ceiling work.
  • Controlled Work Areas: Barriers, warning signs and protective masking help to keep people, equipment and finished surfaces protected.
  • Ventilation / Material Handling: Product instructions and safety data sheets are maintained. Resins are blended in specific areas and waste is disposed of as per site needs.
  • Client Safety Procedures: Our team performs according to the client's permit to work, hot-work and site access procedures.
Site safety controls during a Coatexx flooring installation
Quality Control

Checked before, during and after.

Typical limits below come from resin manufacturers' data sheets. The exact values for your job follow the data sheet of the system we install.
Stage What we check Typical requirement
Before Concrete age New concrete at least 28 days old
Before Moisture in the slab Below 4–5% moisture content, or below 75% relative humidity
Before Concrete strength Compressive strength 25 N/mm² or more; pull-off 1.5 N/mm² or more
Before Site temperature Typically 15–35°C, and at least 3°C above the dew point
During Mixing and batches Correct mix ratio, mixing time and batch numbers recorded
During Coverage and thickness Material used per m² matched to the specified layer build-up
During Time between coats Each coat applied within the manufacturer's recoat window
Handover Finish inspection Visual check for pinholes, bubbles, colour and edges
Handover ESD floors Surface resistance and resistance to earth measured and recorded
Handover Return to use Written guidance on foot traffic, wheeled traffic and full cure times
At Handover

What you receive.

Paperwork your maintenance, QA and audit teams can file and refer back to.

  • Work completion certificate with area, system and dates
  • Material details: product names and batch numbers used
  • Test records where applicable, such as moisture readings and ESD resistance
  • Care and cleaning guide for your housekeeping team
  • Warranty terms: [state your warranty period and conditions]
Credentials

Registered & Compliant.

GST Registration Certificate

Udyam Registration Certificate

Planning a New Floor or Repairing an Existing One?

Share your floor area, usage, and timeline. We’ll inspect the site and suggest the right solution.

Talk to Expert